This map shows the traffic areas affected throughout phase 1 of this project. If there are immediate questions, please contact the Highway Department at (701) 298-2370. Planned completion for this project is Augfor phase 1 and Octofor phase 2. ![]() Other work throughout the project will consist of widening the shoulders to accommodate a three-lane road section along with milling two inches of the existing road surface and replacing it with new hot bituminous pavement. The road top over the new box culverts will also be graded down to allow for improved vision and stopping sight distance. The existing bridge will be replaced with three 13-foot-long, 14-foot-wide, and 17-foot-tall precast reinforced concrete box culverts. Once the roundabout is completed, the next phase 2 of construction will be replacing the existing bridge structure on County Highway 17 north of Riverdale Drive. The new roundabout will be a single lane roundabout, similar to the one located at 52 nd Avenue South. ![]() ![]() Phase 1 of this project will consist of constructing a roundabout at the intersection of 64 th Avenue South and County Highway 17. Construction is scheduled to begin on May 8th. Starting this summer, the Cass County Highway Department will be improving County Highway 17 between 68 th Avenue South and 52 nd Avenue South.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |